When using Shandong utility pole molds, it is important to follow the correct usage methods. Before use, conduct the following checks: First, check if the mold is intact, whether there are any cracks or damage at the lifting points, and whether all accessories such as supports, bolts, nuts, and washers are complete. Also, check for any cracks or damage at the welded joints of other ribs and plates. If any problems are found, repair them promptly before use.
Some precautions for equipment use:
1. Perform proper debugging and inspection.
2. Apply lubricating oil to the bolts during use to ensure durable threaded connections and smooth assembly and disassembly.
3. Before each concrete filling during production, clean the wedge joint to remove accumulated mud, sand, and other debris.
4. The mold must be run on the centrifuge base in the order of slow, medium, and high speed. Direct high-speed start-up is strictly prohibited.
5. The mold should run on the centrifuge for 12 to 15 minutes.
6. When the mold is running on the centrifuge, pay attention to whether it is operating normally. If any abnormalities, unusual noises, or slurry leakage are found, stop the machine immediately for inspection. Operation can only continue after the fault has been rectified.
When lifting, transporting, and demolding Shandong utility pole molds, handle them gently and steadily, ensuring even weight distribution. Avoid collisions or heavy hammer blows. Also, avoid lifting two molds at once.